-
Nome Loveseat
Rated 0 out of 5₹36,999The curved armrests, layered seat cushion and button tufted back of the Nome Loveseat are supported by a wood frame with tapered teak wood legs. Available in a range of playful colours, it’s curvy yet sleek profile makes well cushioned add-on seating in your living room, a reading nook in the study or a spot to curl up on in front of the TV.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Lyon Armless Teak and Rattan Chair
Rated 0 out of 5₹17,999An update on the vintage Pierre Jeanneret Chandigarh chair, the Lyon armless chair is classic yet contemporary. Constructed in teakwood with handcrafted rattan work, this chair holds undeniable charm in a cosy nook, under a desk or at the dining table.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Dover Teak Lounge Chair
Rated 0 out of 5₹29,499Constructed in sleek teakwood frame, the Dover lounge chair brings Scandinavian ease into your home. Available in a rage of contemporary colours, its fits a wide range of styles.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Moira Teak and Rattan Lounge Chair
Rated 0 out of 5₹29,499Beautifully handcrafted in teakwood with rattan work on the sides, the Moira Chair adds a touch of vintage grace to a modern silhouette. With it’s layered cushions and ample seat space it’s bound to be the most preferred parking spot in the house.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Lille Teak and Rattan Lounge Chair
Rated 0 out of 5₹22,599The handcrafted rattan work and sleek teakwood construction gives the Lille lounge chair an airy presence. It’s removable cushions in a clean minimalistic profile make it an iconic and comfortable addition to your home.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.