-
Barnet Oak Study Table – Teak Finish
Rated 0 out of 5₹44,999The versatile Barnet Study Table is all about the details. From it’s fluted drawer fronts, raised side egde detail and sleekly tapered legs, it brings understated elegance to your 9-5 and doubles up as a dresser for evenings out. Crafted in solid oak wood with a veneer top, it’s two side drawers and sleek centre drawer keep you organised.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces is made to order.
-
Dylon Oak and Steel Study Table
Rated 0 out of 5₹24,499Catching up on emails or completing an assignment, the Dylon study table’s streamlined design adds a touch of style to any task. Crafted in solid Oak wood with brushed stainless steel legs, a sleek drawer and a cable manager to keep your work day snarl free.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Dylon Teak and Metal Study Table
Rated 0 out of 5₹29,999 – ₹33,499Catching up on emails or completing an assignment, the Dylon study table’s streamlined design adds a touch of style to any task. Crafted in solid teak wood with black metal legs, a sleek drawer, and a cable manager to keep your workday snarl-free.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces is made to order.
-
Fuji Teak Study Table
Rated 5.00 out of 5₹27,999With it’s subtle detailing, the Fuji teakwood study table adds a touch of style to catching up on emails, doodling time or a study sesh. Crafted in solid teakwood with a drawer to store away those work papers, the Fuji is perfect for your work from home setup.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Lyon Teak Study Table
Rated 5.00 out of 5₹25,999 – ₹29,999With a nod to the classic mid-century modern Pierre Jeanneret silhouette, the Lyon desk’s solid construction, smooth wood surface, and streamlined design add a touch of style to any task. The Lyon is crafted in solid teak wood with two drawers to stash away all your work papers, doodles and takeout menus.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order
-
Reno Teak Study Table
Rated 0 out of 5₹15,999The Reno table in a teak finish with solid teak wood legs with it’s mid-century mordern silhoutte adds big, vintage-inspired style to your space. A flip down door opens to reveal storage space and a place to perch your laptop.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.
-
Shelby Ashwood Study Table
Rated 5.00 out of 5₹29,999The Shelby works smart too! Crafted in solid Ash wood with two push open drawers and a handy shelf, the Shelby makes sure to unclutter and organise your work space.
PRODUCTION TIME: Our manufacturing is currently running with a lead time of 6-8 weeks, as each of our pieces are made to order.